N3S
Manufacturing automation: MES, WMS, ERP, integrations with 1C and data collection terminals.

Industry vertical · Manufacturing

Digitising the shop floor.

MES, WMS, IoT telemetry, ERP integration. We know how to talk to a production manager and not over-promise. We ship what actually lands in prod and gets used on the floor.

What's included

Manufacturing automation: what we deliver.

By manufacturing automation we mean the full cycle: from reviewing shop-floor processes to launching MES and WMS and integrating with ERP, plus web portals for foremen, customers and dealers connected to your accounting. Below is the typical scope.

01

Shop-floor audit

We map the process as it is: equipment, operators, routings, QC. The output is a prioritised report with budget and rollout plan.

02

MES — production execution

Work orders, routing cards, OEE, downtime, defect tracking. UI built for foremen and operators, not developers.

03

WMS — warehouse

Addressable storage, handheld scanners, single-scan inventory. Two-way sync with 1C / ERP, no double data entry.

04

IoT telemetry & predictive

Works on old machines too: current clamps, vibration sensors, simple controllers. Real OEE, downtime, mean-time-between-failure.

05

ERP & 1C integration

Order → production → warehouse → accounting becomes one digital thread. Two-way integrations via REST / queues.

06

Portals for foremen, customers and dealers

Web portals connected to your accounting: requests, order statuses, documents. We don't build websites without process integrations.

Что вы получаете

  • ▸Shop-floor process map and automation plan
  • ▸Architecture: MES + WMS + ERP + portals
  • ▸Loop-by-loop rollout with dual write
  • ▸Foreman and operator training
  • ▸Support contract

Common pain

Manufacturing pains we fix.

01

No real OEE number

Shop manager and finance argue about downtime with different numbers. We instrument the machines (even old ones) and produce one source of truth.

02

Double inventory tracking

Warehouse runs Excel, 1C lags a day. We deploy a WMS that actually works on handheld scanners, not 'in theory'.

03

Paper work orders

Production tasks on paper → losses, re-entries, KPI errors. We move them into a MES with a UI a foreman can read.

04

ERP can't see the floor

Order is received but what's happening to it in production is invisible. We link ERP and MES, add dashboards for top management.

05

Equipment downtime

IoT telemetry, predictive maintenance. No magic promised: a tool that helps cut downtime.

06

No quality analytics

Defects counted on a napkin. We collect reasons, build dashboards, correlate to operators/shifts/materials.

FAQ

What people usually ask about manufacturing automation.

It depends on plant size and the number of loops. We name the first-stage budget after the process review, which is free. Fixed-price products: a process automation web app from ₽250K in 2–3 weeks, turnkey Bitrix24 from ₽300K in 3–4 weeks.

With a free process review: interviews with the production manager and key staff, a process map and a list of what to automate first.

We don't build websites without process integrations. We build web portals for foremen, customers and dealers connected to accounting, the warehouse and ERP.

Yes: specifications, operating procedures for the system and staff manuals.

We name the first-stage timeline after the review. A web app for one process takes 2–3 weeks, turnkey Bitrix24 takes 3–4 weeks.

Tell us about your plant — we'll figure out how to fix it.

Discuss your project →