How a steel-structures plant stopped losing orders on their way to the shop floor

One workspace in Bitrix24: sales, production and finance in three linked pipelines, and every customer channel in one window.

How a steel-structures plant stopped losing orders on their way to the shop floor
  • 3 linked pipelines
  • One contact center
  • Automatic production schedule

// Client

A plant that manufactures steel structures.

// Before

  • The customer base lived in Excel and Google Sheets.
  • Orders sat in different systems and documents; some requests never reached production and customers left.
  • Customers wrote in messengers and social networks, while managers worked by phone and email.
  • There was no control over task completion.

// What we built

  1. 01Three linked CRM pipelines: Sales, Production, Finance. As a deal moves, staff get tasks automatically.
  2. 02One contact center: social networks, messengers, email and IP telephony, with every request handled in Bitrix24.
  3. 03An automatic production schedule: tasks start in sequence, and the next one doesn't begin until the previous one is done.
  4. 04Automatic reports, including sales; managers see every deal in real time.

Process map

  1. 01

    Contact center

  2. 02

    Sales pipeline

  3. 03

    Production pipeline

  4. 04

    Finance pipeline

// Integrations

  • Bitrix24
  • IP telephony
  • Messengers and social networks
  • Email
Bitrix24
three linked pipelines, tasks, reports
IP telephony
calls are handled in the contact center
Messengers and social networks
requests arrive in the contact center
Email
customer emails are handled in Bitrix24